In situ test study on the application effect of the thermosyphon along the Chaimu Railway
Zhang, B.1; Sheng, Y.1; Chen, J.1; Li, J.1; Chou, Y.L.2
2011
会议名称14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering, ARC 2011
会议录名称14th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering
会议日期May 23, 2011 - May 27, 2011
会议地点Hong Kong, China
出版者Hong Kong Geotechnical Society (HKGES)
摘要The Chaimu Railway (CMR) is being constructed for the coal resource transportation in northern Qinghai-Tibet plateau. The total length of the line is 142km. The permafrost in this region is warm, ice-rich and unstable. For the purpose of cooling soil and stabilizing the subgrade, thermosyphon technique was adopted in a quarter of the whole line. Three monitoring sites with different mean annual ground temperatures have been arranged to study the thermosyphon effect since 2007. According to the ground temperature observation results, from 2007 to 2009, the thermosyphon could cool down the underlying permafrost and raise the artificial permafrost table. Analysis of the observational settlement data from 2008 to 2009 showed that the maximum accumulated settlements of test sections were about 5cm. The thermosyphon technology has obvious effect on decreasing the subgrade base temperature and protecting permafrost. Thus thermosyphon is applicable in railway construction in warm, ice-rich permafrost regions.
关键词Capillary flow Coal deposits Coal transportation Geotechnical engineering Permafrost Railroads Soil mechanics Thermosyphons Accumulated settlements Application effect Base temperature Ground temperature Ice-rich permafrost Qinghai Tibet plateau Railway construction Thermosyphon technology
收录类别EI
语种英语
EI入藏号20124115550668
EI主题词Siphons
来源库Compendex
分类代码409 Civil Engineering, General - 481 Geology and Geophysics - 483.1 Soils and Soil Mechanics - 503 Mines and Mining, Coal - 616.1 Heat Exchange Equipment and Components - 619.1 Pipe, Piping and Pipelines - 631.1 Fluid Flow, General
文献类型会议论文
条目标识符https://ir.lut.edu.cn/handle/2XXMBERH/116598
专题土木工程学院
作者单位1.State Key Laboratory of Frozen Soil Engineering, Cold and Arid Regions Environmental and Engineering Research Institute, Chinese Academy of Sciences, Lanzhou, China;
2.School of Civil Engineering, Lanzhou University of Technology, Lanzhou, China
推荐引用方式
GB/T 7714
Zhang, B.,Sheng, Y.,Chen, J.,et al. In situ test study on the application effect of the thermosyphon along the Chaimu Railway[C]:Hong Kong Geotechnical Society (HKGES),2011.
条目包含的文件
条目无相关文件。
个性服务
查看访问统计
谷歌学术
谷歌学术中相似的文章
[Zhang, B.]的文章
[Sheng, Y.]的文章
[Chen, J.]的文章
百度学术
百度学术中相似的文章
[Zhang, B.]的文章
[Sheng, Y.]的文章
[Chen, J.]的文章
必应学术
必应学术中相似的文章
[Zhang, B.]的文章
[Sheng, Y.]的文章
[Chen, J.]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。