IR
Modelling and solving for ready-mixed concrete scheduling problems with time dependence
Zhang, Guo-Chen1,2; Zeng, Jian-Chao2
2013
发表期刊International Journal of Computing Science and Mathematics
ISSN17525055
卷号4期号:2页码:163-175
摘要In this paper, we present a formulation for the ready-mixed concrete scheduling problems with time-dependent travel time. Traffic congestion is a major problem for the business of delivering RMC. It may lead to late deliveries of RMC to construction sites, and because RMC is perishable, late deliveries also mean large additional costs for both batch plants and the construction companies. Additional costs caused by traffic congestion can be reduced by taking predictable traffic congestion into account in the process of scheduling. For this purpose we develop a model with consideration of traffic congestion of RMC which uses a heuristic approach based on local search algorithm to solve. A detailed case study based on industrial data is used to illustrate the potential of the proposed approach. Copyright © 2013 Inderscience Enterprises Ltd.
关键词Concrete mixers Construction industry Heuristic methods Learning algorithms Local search (optimization) Ready mixed concrete Scheduling Travel time Additional costs Construction companies Construction sites Heuristic approach Industrial datum Local search algorithm Scheduling problem Time dependence
DOI10.1504/IJCSM.2013.055213
收录类别EI ; ESCI
语种英语
WOS研究方向Engineering
WOS类目Engineering, Multidisciplinary
WOS记录号WOS:000219931100006
出版者Inderscience Publishers
EI入藏号20133116559060
EI主题词Traffic congestion
EI分类号405 Construction Equipment and Methods ; Surveying - 412 Concrete - 431 Air Transportation - 432 Highway Transportation - 433 Railroad Transportation - 434 Waterway Transportation - 912.2 Management - 921.5 Optimization Techniques
来源库Compendex
分类代码405 Construction Equipment and Methods; Surveying - 412 Concrete - 431 Air Transportation - 432 Highway Transportation - 433 Railroad Transportation - 434 Waterway Transportation - 912.2 Management - 921.5 Optimization Techniques
引用统计
文献类型期刊论文
条目标识符https://ir.lut.edu.cn/handle/2XXMBERH/113443
专题兰州理工大学
通讯作者Zhang, Guo-Chen
作者单位1.Lanzhou Univ Technol, Coll Elect & Informat Engn, Lanzhou 730050, Gansu, Peoples R China;
2.Taiyuan Univ Sci & Technol, Complex Syst & Computat Intelligence Lab, Taiyuan 030024, Shanxi, Peoples R China
第一作者单位电气工程与信息工程学院
通讯作者单位电气工程与信息工程学院
第一作者的第一单位电气工程与信息工程学院
推荐引用方式
GB/T 7714
Zhang, Guo-Chen,Zeng, Jian-Chao. Modelling and solving for ready-mixed concrete scheduling problems with time dependence[J]. International Journal of Computing Science and Mathematics,2013,4(2):163-175.
APA Zhang, Guo-Chen,&Zeng, Jian-Chao.(2013).Modelling and solving for ready-mixed concrete scheduling problems with time dependence.International Journal of Computing Science and Mathematics,4(2),163-175.
MLA Zhang, Guo-Chen,et al."Modelling and solving for ready-mixed concrete scheduling problems with time dependence".International Journal of Computing Science and Mathematics 4.2(2013):163-175.
条目包含的文件
条目无相关文件。
个性服务
查看访问统计
谷歌学术
谷歌学术中相似的文章
[Zhang, Guo-Chen]的文章
[Zeng, Jian-Chao]的文章
百度学术
百度学术中相似的文章
[Zhang, Guo-Chen]的文章
[Zeng, Jian-Chao]的文章
必应学术
必应学术中相似的文章
[Zhang, Guo-Chen]的文章
[Zeng, Jian-Chao]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。