A jigsaw puzzle inspired algorithm for solving large-scale no-wait flow shop scheduling problems | |
Zhao, Fuqing1; He, Xuan1; Zhang, Yi2; Lei, Wenchang1; Ma, Weimin3; Zhang, Chuck4; Song, Houbin1 | |
2020-01 | |
发表期刊 | Applied Intelligence |
ISSN | 0924669X |
卷号 | 50期号:1页码:87-100 |
摘要 | The no-wait flow shop scheduling problem (NWFSP), as a typical NP-hard problem, has important ramifications in the modern industry. In this paper, a jigsaw puzzle inspired heuristic (JPA) is proposed for solving NWFSP with the objective of minimizing makespan. The core idea behind JPA is to find the best match for each job until all the jobs are scheduled in the set of process. In JPA, a waiting time matrix is constructed to measure the gap between two jobs. Then, a matching matrix based on the waiting time matrix is obtained. Finally, the optimal scheduling sequence is built by using the matching matrix. Experimental results on large-scale benchmark instances show that JPA is superior to the state-of-the-art heuristics. © 2019, Springer Science+Business Media, LLC, part of Springer Nature. |
关键词 | Benchmarking Heuristic algorithms Machine shop practice NP-hard Scheduling Algorithm for solving Jigsaw puzzles Makespan Matching matrix Minimizing makespan No-wait flow-shop scheduling Optimal scheduling State of the art |
DOI | 10.1007/s10489-019-01497-2 |
收录类别 | EI ; SCIE |
语种 | 英语 |
WOS研究方向 | Computer Science |
WOS类目 | Computer Science, Artificial Intelligence |
WOS记录号 | WOS:000511764700007 |
出版者 | Springer |
EI入藏号 | 20192907191427 |
EI主题词 | Job shop scheduling |
EI分类号 | 604.2 Machining Operations - 723.1 Computer Programming - 912.2 Management - 921.5 Optimization Techniques |
来源库 | Compendex |
分类代码 | 604.2 Machining Operations - 723.1 Computer Programming - 912.2 Management - 921.5 Optimization Techniques |
引用统计 | |
文献类型 | 期刊论文 |
条目标识符 | https://ir.lut.edu.cn/handle/2XXMBERH/115516 |
专题 | 经济管理学院 国际合作处(港澳台办) 研究生院 |
通讯作者 | Zhao, Fuqing |
作者单位 | 1.Lanzhou Univ Technol, Sch Comp & Commun Technol, Lanzhou 730050, Peoples R China; 2.Xijin Univ, Sch Mech Engn, Xian 710123, Peoples R China; 3.Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China; 4.Georgia Inst Technol, H Milton Stewart Sch Ind & Syst Engn, Atlanta, GA 30332 USA |
第一作者单位 | 兰州理工大学 |
通讯作者单位 | 兰州理工大学 |
第一作者的第一单位 | 兰州理工大学 |
推荐引用方式 GB/T 7714 | Zhao, Fuqing,He, Xuan,Zhang, Yi,et al. A jigsaw puzzle inspired algorithm for solving large-scale no-wait flow shop scheduling problems[J]. Applied Intelligence,2020,50(1):87-100. |
APA | Zhao, Fuqing.,He, Xuan.,Zhang, Yi.,Lei, Wenchang.,Ma, Weimin.,...&Song, Houbin.(2020).A jigsaw puzzle inspired algorithm for solving large-scale no-wait flow shop scheduling problems.Applied Intelligence,50(1),87-100. |
MLA | Zhao, Fuqing,et al."A jigsaw puzzle inspired algorithm for solving large-scale no-wait flow shop scheduling problems".Applied Intelligence 50.1(2020):87-100. |
条目包含的文件 | 条目无相关文件。 |
个性服务 |
查看访问统计 |
谷歌学术 |
谷歌学术中相似的文章 |
[Zhao, Fuqing]的文章 |
[He, Xuan]的文章 |
[Zhang, Yi]的文章 |
百度学术 |
百度学术中相似的文章 |
[Zhao, Fuqing]的文章 |
[He, Xuan]的文章 |
[Zhang, Yi]的文章 |
必应学术 |
必应学术中相似的文章 |
[Zhao, Fuqing]的文章 |
[He, Xuan]的文章 |
[Zhang, Yi]的文章 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论